Heat Pump Install Day: What Actually Happens, Hour by Hour

Published May 3, 2026 14 min read By BC Home Service Team

The quote is signed, the permit is in, the truck is coming Thursday, and the only thing nobody has explained is what actually happens between the doorbell and the moment your new heat pump first breathes warm air. This is that walkthrough, hour by hour, from floor protection at 8 in the morning to the commissioning measurements that end the day: where the crew drills, why the vacuum pump matters more than anything else you will watch, what your house loses power for and when, what can go sideways and how a flat-rate quote absorbs it, and what our office finishes for you afterward, from permit inspections to the rebate filing. Written by the crews, not the brochure.

Old heating equipment being removed on heat pump installation day at a Metro Vancouver home
Install day starts where the old system ends: equipment out, floor protection down, and the hour-by-hour sequence already running before the coffee is finished.
Chapter 1

The Honest Answer Up Front

Install day for a heat pump in Metro Vancouver is shorter and calmer than most homeowners expect. A single-zone ductless system is a one-day job, a multi-zone system runs one to two days, and a full ducted conversion with an air handler runs two to three. The crews arrive in the morning, work through a rehearsed sequence, and the machine that heats and cools your house for the next decade is running before dinner, or before the second dinner at worst. What separates a good install day from a regrettable one is not the equipment, it is the preparation before the truck arrives and the commissioning hour before the crew leaves, and both of those are the parts of the day this guide walks in detail.

The honest framing: the visible work, mounting, drilling, pipe running, looks like construction and feels like the main event, but the invisible work is what your fifteen years of ownership actually rest on. A refrigerant loop pulled to a deep vacuum and held under a standing pressure test before charging, a charge weighed to the calculated amount rather than eyeballed, airflow and temperature measurements recorded with the system running, and a condensate drain tested with real water. Our heat pump installation crews run that sequence on every job without exception, because the callbacks we never get are the ones that pay for the commissioning hour.

Combined CleanBC Better Homes, BC Hydro, FortisBC and municipal top-ups can reach $16,000 for cold-climate heat pumps in 2026 — we complete the paperwork, and a share of that paperwork is generated on install day itself: the commissioning numbers, the model and serial records, the permit documentation. Install day is not just the day the equipment goes in. It is the day the rebate file gets built.

Anyone can bolt a heat pump to a wall in three hours. The install you want is the one where the last hour is spent measuring the first three hours of work.

0 single zone

The standard single-head ductless install: crew arrives around 8, system commissioned and cleaned up before supper.

0 ducted

Air handler, cutover, duct modifications and full commissioning, the longest version of the day.

0 jobs since 2010

The sequence below is not theory. It is twelve thousand installs and service calls of rehearsal.

0 workmanship warranty

On the labour, in writing, on top of registered manufacturer parts coverage, and the commissioning sheet is the receipt.

Chapter 2

The Weeks Before: Why Good Days Start Early

Install day is the last day of a process, and the process is where quality gets decided. The site assessment visit walks the house with you: room measurements for the load calculation, wall and route inspection for the line sets, outdoor unit placement against sound and bylaw rules, and the electrical panel review. The quote that follows prices the whole job flat-rate, with the routing, electrical scope and commissioning named on paper. Nothing on install day should be a surprise to anyone holding that document.

Two paperwork tracks run in parallel. Permits: electrical work proceeds under permit with the licensed trades, and any gas-side work, a furnace being decommissioned and capped, for example, is handled under the applicable BC safety authority rules. Rebate pre-approval: where a program offers or requires pre-registration, filing it before the equipment order protects the eligibility date and the incentive amount, and our office runs that filing as part of the job. Our Vancouver heat pump crews and every other city team follow the same sequence, because the sequence is what keeps the schedule honest.

1

Site assessment and load calculation

Room-by-room heat loss and gain, route walk, outdoor placement, panel review. The numbers that size the system.

2

Flat-rate quote and equipment order

Written price with routing, electrical and commissioning itemized. Equipment ordered once, correct, for your scope.

3

Permits and rebate pre-approval

Electrical permit in motion, gas-side filings where a furnace retires, program pre-registration where offered.

4

Scheduling and a prep checklist

Install date, crew size and day plan confirmed, with the homeowner prep list from Chapter 3 in your inbox.

Chapter 3

Your Part: The Homeowner Prep List

Install day asks surprisingly little of you, and the few items on the list are the ones that keep the schedule from bending. Clear access matters more than cleaning: the crew needs a path from the truck to the work areas, wall space below and around each head location, the area around the electrical panel, and the outdoor unit site cleared of planters, bikes and the recycling stack that gravitates there.

Prep itemWhy it mattersWhen
Clear the path and work areasMovers and drills do not mix with heirlooms; access speed is schedule speedEvening before
Confirm head and thermostat locationsFinal placement marks happen with you present, before drilling startsMorning of, 10 minutes
Pets contained or outOpen doors, strangers and power tools; everyone is happier, pets includedAll day
Parking access at the truckA blocked van is a blocked schedule; the 240-volt equipment is heavyAll day
Wall and furniture clearance at each headA metre of working room per head; pictures come down, sofas scootEvening before
Someone reachable by phoneFor the one decision that occasionally surfaces mid-dayAll day

Working from home on install day is entirely feasible, with expectations set: the drilling is loud, brief and clustered in the morning, the crew works in a couple of zones at a time, and the vacuum pump hums steadily for a stretch of the afternoon. Households with babies or night-shift sleepers usually book a day elsewhere for a ducted cutover and stay home happily for a single-head install. If your building is a strata, the elevator booking and certificate of insurance, where the strata wants one, are arranged before the day, not during it, and our office handles that paperwork routinely for the condo jobs in our Richmond heat pump territory.

Chapter 4

The Day, Hour by Hour

This is the single-zone version of the day, the most common shape; multi-zone repeats the indoor work per head and ducted conversions replace the mounting work with the air handler cutover. The sequence never changes, because the sequence is the quality.

1

8:00 arrival, protection, walkthrough

Crew arrives, drop sheets and floor protection go down, head and outdoor locations get final marks with you, questions answered, coffee accepted.

2

8:30 outdoor site work

Pad set or brackets mounted, outdoor unit placed on risers to clear snow and rain splash, service clearances verified.

3

9:00 line-set routing

The hole behind each head location is drilled, one clean penetration per head, insulated refrigerant lines and control cable routed to the outdoor unit, wall sleeves sealed.

4

10:30 indoor heads mounted

Heads hung on their mounting plates, connected to the lines and condensate runs, level checked, because a crooked head leaks condensate eventually.

5

12:30 electrical connection

The 240-volt circuit lands at the outdoor unit under permit, heads receive their low-voltage control wiring, and the breaker stays off until commissioning.

6

14:00 vacuum and pressure test

The refrigerant loop is pulled to a deep vacuum measured in microns and held, then proven tight. The step that separates a decade of reliability from a slow decline.

7

15:00 charge, power and test

Refrigerant weighed in to the calculated charge, power on, operating modes tested in heat and cool, defrost logic verified in season.

8

16:00 commissioning and walkthrough

Measurements recorded on the commissioning sheet, condensate drain tested with real water, thermostat and app setup walked with you, filters shown, cleanup done.

The Vancouver heat pump guide covers what all of this buys you from the equipment side. What the sequence buys you is quieter: a loop with no moisture and no leaks, a charge that matches the line lengths, and a system whose first winter behaves like its fifth.

Chapter 5

The Commissioning Hour: What Gets Measured and Why

Commissioning is the difference between an installed heat pump and a working one, and it is an hour of measuring rather than guessing. The commissioning sheet from your job should read like a report card: measured airflow and delivered temperature split, refrigerant pressures and the calculated superheat and subcooling that confirm the charge is right for your exact line lengths, voltage and current draw on the circuit, defrost function verified, and a condensate drain proven with water poured through it. Those numbers are what the rebate programs ask to see, what the warranty record rests on, and what our two-year workmanship warranty quietly stands behind.

MeasurementWhat it provesIf it is skipped
Deep vacuum, heldNo moisture or non-condensables in the loopCorrosion, erratic metering, years of degraded capacity
Standing pressure testThe joints and lines hold, no leakSlow refrigerant loss discovered next winter
Charged by weightThe exact refrigerant charge for your line lengthsEfficiency off-spec, short-cycling, comfort complaints
Airflow and temperature splitThe head moves the rated air and delivers rated capacityUndiscovered restriction or sizing mismatch
Electrical readingsThe circuit and connections are soundNuisance trips and connection failures later
Condensate drain testWater leaves the house in cooling modeThe ceiling stain that generates the angry August call

A homeowner's honest test of any installer is simple: ask to see the commissioning sheet at the end of the day. The answer tells you everything about the decade that follows. If the numbers are there, you own a system with a birth certificate. If the sheet does not exist, the $89 diagnostic and the repair conversation tend to arrive within a couple of winters, and that is the pool of callbacks our service crews fish in, installed by somebody else, every January.

Chapter 6

What Can Go Sideways, and What Happens Next

After twelve thousand jobs, the surprise list is short and stable, and almost every surprise has a same-day answer. The honest install day plans for them instead of promising they never happen, and the flat-rate quote means the answer is already paid for when one appears.

SurpriseHow it shows upThe same-day answer
Wall obstructions behind a headDrill meets a stud pocket, pipe run or unexpected blockingShift the head a few centimetres or re-route, confirmed with you before drilling continues
Panel capacity tighter than expectedThe 240-volt circuit does not fit the loaded panelRetired baseboard breakers decommissioned to free space, or the electrical scope adjusted under the permit
Old line sets or dead equipment in the pathA retired AC or furnace occupies the route or padDecommission and removal added to the day, disposed properly
WeatherRain, mostly; coastal installs work in almost anythingTarps and sequencing; outflow cold shifts the vacuum and test window, not the standard
Strata or access rulesElevator windows, roof or common-property accessPre-booked weeks ahead; a mid-day stall here is a scheduling miss, not an install problem
Refrigerant architecture mismatchField-discovered, rare, on phased conversionsDesign call before the day continues; the load calculation exists to prevent exactly this

The pattern behind every row: surprises are cheap on paper and expensive in drywall. The site assessment exists to move them to the paper stage, and the honest crews are the ones who walk your house before quoting a number at it. When a day does extend past plan, it extends for the right reasons, a vacuum that will not hold until a fitting is found, a wall that refuses the planned route, and the flat-rate price does not move with it.

Chapter 7

After the Trucks Leave: Inspections, Warranties, Rebates

Three threads finish in the days and weeks after the install. The permit inspections close out the electrical and any gas-side filings with the authorities having jurisdiction, and the inspection visit is a free second set of eyes on the connection quality. The warranty registration, manufacturer parts coverage filed with model and serial numbers from your job, is completed by our office, with the terms stored with your commissioning sheet, and the 2-year workmanship warranty from our side sits on top of it. And the rebate applications, with the commissioning documentation the programs ask for, are completed by us, with follow-up handling if a program queries anything.

Your part in the aftermath is a calendar. The first filter rinse or replacement about a month in, the seasonal rhythm from there, and the professional maintenance visit booked for the following year, ideally in the shoulder season when schedules are wide open. Households that do those three things own the boring version of heat pump ownership, which is the entire goal. Households that skip them meet us eventually under less relaxed circumstances, and the financing and rebates page is the standing reference for the money side of everything above.

Newly commissioned heat pump system running after a completed one-day installation in a British Columbia home
The end of the hour-by-hour: system running, commissioning sheet filled, floor protection folded up, and the house warmer and quieter than it was at breakfast.
Chapter 8

Living Through the Day: Pets, Kids and Work Calls

The human logistics deserve their own chapter because they generate half the pre-install questions we field. Kids and install days coexist fine: the interesting parts, mounting, vacuum pump, temperature gun, are brief and watchable from a safe distance, and the boring parts are long. Dogs are the honest wildcard, every tradesperson's favourite and every floor's worst enemy on a wet February day, so a contained or absent dog is a kind gift to everyone including the dog. The drilling phase, roughly twenty loud minutes per head, is the only stretch that genuinely interrupts a work call, and crews will tell you when it is coming if you ask.

Power interruptions are brief and scheduled. The work happens unpowered for most of the day; the moments when your house loses power are the connection and cutover steps, minutes each, announced ahead. A ducted conversion is the exception, the furnace cutover and air handler swap can take the heating system offline for a stretch of hours, which is why those jobs are booked with the weather in mind and almost never during the first cold snap of November. The house does not get cold in an afternoon, and the new system is usually holding temperature before the old one would have finished its evening warm-up.

Homeowner checklist for heat pump install day preparation with cleared access and confirmed placements
The morning-of version of Chapter 3: access cleared, locations confirmed, pets arranged, coffee on. The day runs on rails from there.
Chapter 9

Six Install Days, From Our Recent Book

Every install day is the same sequence wearing a different house. These six are the recurring shapes from the last season of jobs, and the differences are exactly where the honest planning lives.

Single head for a cold basement suite

One day, done by 4. The whole day is Chapter 4 at its cleanest: one drill, one vacuum, one commissioning sheet.

Multi-zone conversion of a two-storey Surrey home

Two days: outdoor and lines on day one, remaining heads, commissioning and walkthrough on day two.

Furnace-to-air-handler ducted conversion

Two to three days with the cutover centrepiece, heat offline for a stretch, booked into a mild forecast window.

Strata townhouse with elevator rules

Same install, extra paperwork: elevator booked, insurance certificate filed, common-area protection doubled.

Outflow-week January emergency replacement

The sequence unchanged, the stakes higher. Cold-weather installs work; the vacuum standard does not move for the calendar.

Laneway home, compact two-head system

One day. Small buildings are quick, and the commissioning hour is still the longest hour of it.

Chapter 10

When to Book, and the Rebate Calendar

Shoulder seasons, April to June and September to October, are the civilized booking windows: crews have schedule room, the weather cooperates with the outdoor work, and the system gets a full commissioning in mild conditions before its first real season. Midsummer and deep winter are the crunch windows, when emergency demand competes with booked installs, and the honest advice is to book the crunch months early or hold for the shoulder. The exception proves the rule: the January emergency replacement gets done in January, because it has to.

The rebate calendar deserves attention at booking time. The combined CleanBC, BC Hydro, FortisBC and municipal top-ups can reach $16,000 for cold-climate heat pumps in 2026, with our office completing the paperwork, and pre-approval filings tied to the install date protect the household position against program changes mid-year. Booking in the spring shoulder season with pre-approval in hand is the combination that captures the stack at its widest and the calendar at its calmest, and it is the version of the decision that requires nothing heroic from anyone.

Chapter 11

The Install-Day Cheat Sheet

Printable, fridge-door format. If the day deviates from this shape, the deviation should have a name and a reason, and the flat-rate price should not be one of them.

QuestionThe answer
How long does it take?One day single zone, one to two multi-zone, two to three ducted
What must happen before?Site assessment, load calculation, flat-rate quote, permits, rebate pre-approval
My homework?Clear access, confirm locations, contain pets, parking for the van
Power off?Brief scheduled moments only; longer for a ducted cutover
The step that matters most?Deep vacuum, standing pressure test, weighed charge, recorded commissioning
What proves it was done?The commissioning sheet, ask for it before the crew leaves
After the day?Permit inspections, warranty registration, rebate filing, all handled by our office
Best booking window?Shoulder seasons with rebate pre-approval filed first
Quick answers

Frequently Asked Questions

A single-zone ductless heat pump is a one-day installation, typically arriving around 8 and finishing commissioning and cleanup by late afternoon. Multi-zone ductless systems run one to two days as each head repeats the mounting and connection work. Ducted conversions with an air handler run two to three days because the furnace cutover, any duct modifications and the full commissioning sequence add to the schedule. Weather, access surprises and strata logistics can extend any of these, and a flat-rate quote means the extension does not change the price.
You need to be reachable and present for two short windows: the morning walkthrough, where final head and thermostat locations get marked with you, and the end-of-day walkthrough, where the crew walks you through operation, filters, the thermostat and the commissioning results. Between those, households either stay and work around the drilling windows or hand over access and return for the walkthrough. Someone reachable by phone covers the occasional mid-day decision, which is rare when the site assessment was done properly.
Four things cover almost everything. Clear the work areas: a metre of space below and around each planned head location, the path from the truck, the electrical panel and the outdoor unit site. Contain or remove pets for the day. Confirm parking access for the van, since the equipment is heavy and the day runs on access speed. And be ready to approve the final placement marks in the morning before drilling starts, which takes about ten minutes. Strata buildings add elevator bookings and insurance paperwork, which our office arranges ahead of the day.
Power interruptions are brief and scheduled: the work proceeds unpowered for most of the day, and the connection moments are minutes long and announced. Heating is offline for longer only on ducted conversions, where the furnace cutover and air handler swap take the heating system down for a stretch of hours, which is why those jobs are booked in mild weather windows and almost never during the first cold snap of the season. A house does not cool meaningfully in an afternoon, and the new system is usually holding temperature by evening.
Three threads complete after the crew leaves. Permit inspections close out the electrical and any gas-side filings with the authorities having jurisdiction, which our office books. Warranty registration is filed with the manufacturer using the model and serial numbers from your job, and our two-year workmanship warranty sits on top of the parts coverage, backed by the commissioning sheet. And the rebate applications are completed by us with the commissioning documentation attached, with follow-up handling if a program queries anything. Your only jobs are the first filter rinse about a month in and booking the maintenance visit for the following year.
Written by the BC Home Service Team

Red Seal certified, licensed gas fitters (BC-PL-2019-4421), $2M insured and 15-plus years in the field, with more than 12,000 jobs completed across Metro Vancouver since 2010 and a 5.0-star rating across 26 Google reviews. We wrote this guide because install day is the day homeowners remember for fifteen years, and the difference between a good one and a regrettable one is almost never the equipment. It is the preparation before the truck and the measurements before the goodbyes. To book instead of DIY, see heat pump repair in Vancouver — same-day across the city.

More about our team →
Free Estimate

Book Your Install Day

Book a free install estimate with a Red Seal estimator. You get a site assessment and heat-loss calculation, a written flat-rate price with the routing, electrical scope and commissioning itemized, the rebate pre-approval filed, and a scheduled install day with a prep checklist. Zero obligation, same-day quotes on most calls. We cover this in detail in Furnace Install Day: What to Expect in BC. If you would rather hand this to a pro, our heat pump services pages cover Metro Vancouver.

Heating down right now?

No-heat calls are answered 24/7 with live dispatch and flat after-hours pricing posted in advance. Daytime? The $89 diagnostic is usually same-day in Vancouver, Burnaby and Surrey.

Call 604-615-2212 WhatsApp Us
Licensed gas fitters, Technical Safety BC permitted installs
10-year parts warranties registered for you
Financing from 7.99% with approved credit
24/7 emergency line, average 45-minute response
Call Now Free Quote